Industrial Packaging Equipment
Fully Automatic Packaging Machinery SupplierCustom Automated Packing Solutions & Factory Pricing
30+ years of machine building · 50+ fully automatic models · Lines installed in 100+ countries
Choosing a fully automatic packaging machinery supplier is a capital decision that locks in line speed, changeover time and compliance for the next 10–15 years. This page is written for procurement managers, plant engineers and brand owners comparing multi-lane stick pack machines, sachet systems, VFFS baggers and complete turnkey lines sourced directly from a factory. It covers the specifications to request, the certifications that matter for food, pharma and chemical products, how factory-direct quotes are structured, and what to expect on minimum order, lead time and after-sales support.
Key takeaways
- Multi-lane stick pack and sachet systems run 2–16 lanes at up to 75 cycles per lane per minute, delivering 100–1,200 packs per minute from one machine footprint.
- Factory-direct sourcing removes the 15–30% distributor margin typical in packaging equipment channels; minimum order is 1 set for both standard machines and custom lines.
- Standard models ship in 35–60 days; fully customised turnkey lines take 90–150 days including factory acceptance testing on your own product.
- Food-contact parts in SUS304/316L, CE technical documentation and FDA 21 CFR 177-compliant gaskets should be written into the quotation before any deposit is paid.
- Ludyway builds 50+ intelligent packaging machine models in a 20,000㎡ plant with 130+ packaging specialists and 200+ manufacturing equipment units.
Fully Automatic Machines & Turnkey Lines Built to Order
Eight of the most requested configurations from our 50+ model range. Every unit is quoted per specification after a product test, so no list prices are shown.
View all fully automatic packaging machines →
What a Fully Automatic Packaging Machinery Supplier Should Actually Deliver
Integrated sachet line: dosing, multi-lane forming, inspection and cartoning under one control system.
“Fully automatic” has become a loose marketing term. In engineering terms, a fully automatic packaging line takes bulk product from a hopper or tote and delivers coded, inspected, palletised cases with no manual intervention between stations. That requires the supplier to scope and integrate five functional blocks, not just sell a filler.
- Feeding and dosing: vacuum or screw conveyors, auger fillers for powder (±0.1–0.3 g), volumetric cups or multihead weighers for granules, piston or gear pumps for liquids and pastes.
- Form-fill-seal: multi-lane stick pack, 4-side seal sachet, VFFS or rotary premade pouch, with servo film pull and PID-controlled sealing jaws.
- Inline inspection: checkweigher, metal detector or X-ray, vision check of seal and print.
- Secondary packaging: counting, cartoning, case packing and sealing.
- End of line: coding, strapping, stretch wrapping and robotic palletising.
A supplier that builds the filler and subcontracts the rest leaves you managing three warranties and three control architectures. Confirm that the HMI, PLC platform (Siemens, Omron, Mitsubishi or Allen-Bradley) and recipe management are unified through a packaging line integration system, and that a single line-level OEE figure is reported during factory acceptance.
Machine Types, Formats and Typical Specifications
The table below summarises the performance envelope buyers can realistically specify for each fully automatic format. Actual speed depends on product flowability, film structure and fill weight, so every figure should be validated with your own product before a purchase order.
| Machine format | Typical products | Lanes / output | Fill range | Dosing accuracy |
|---|---|---|---|---|
| Multi-lane stick pack (3-side seal) | Instant coffee, sugar, electrolyte powder, honey, energy gel | 2–16 lanes, 30–75 cycles/min per lane | 0.5–100 g or 1–50 ml | ±0.1–0.3 g auger; ±0.5% piston |
| Multi-lane 4-side seal sachet | Shampoo, ketchup, pharma granules, seasoning, cosmetic cream | 2–12 lanes, 25–60 cycles/min per lane | 1–200 g / ml | ±0.2–0.5 g |
| VFFS pillow / gusset bag | Snacks, pet kibble, rice, frozen food, nuts | Single lane, 30–120 bags/min | 50 g – 5 kg | ±0.5–1% with multihead weigher |
| Rotary premade pouch / doypack | Wet pet food, zipper pouches, protein powder | 6–10 stations, 30–60 pouches/min | 100 g – 5 kg | ±0.5–1% |
| Bulk bagging 10–50 kg | Fertiliser, feed pellets, flour, resin, chemicals | 1–2 spouts, 200–1,200 bags/hour | 10–50 kg | ±0.1–0.2% net weight |
For single-dose products, the multi-lane stick pack and sachet packaging machine is the highest output per square metre of floor space. Pair it with a high-precision checkweigher when giveaway control matters: on a 3 g electrolyte stick running 600 packs per minute, a 0.1 g overfill costs more than 2.5 tonnes of product per year.
How a Custom Automated Packing Solution Is Engineered
A custom line is not a catalogue machine with a different colour. The workflow below is what a capable fully automatic packaging machinery supplier should follow from first enquiry to signed site acceptance.
STEP 1
Product & film test
Ship 2–5 kg of product and film samples. Flowability, bulk density, moisture sensitivity, film COF and seal window are measured in 3–5 working days.
STEP 2
URS & quotation
Target speed, pack dimensions, number of SKUs, utilities (380V/50Hz or 480V/60Hz, 0.6 MPa air) and plant layout are fixed. A configured quote follows within 3–7 days.
STEP 3
Mechanical & electrical design
3D line layout, P&ID for liquid systems and control architecture are issued for approval in 2–3 weeks. Changeover parts and spare lists are defined here.
STEP 4
Manufacturing
Frames, hoppers and formers are machined in-house on 200+ equipment units. Standard machines complete in 35–60 days; turnkey lines in 90–150 days.
STEP 5
Factory acceptance test
A 2–4 hour continuous run on your product with documented OEE, seal integrity and fill-weight Cpk. Live video FAT is offered when travel is not practical.
STEP 6
Shipping, installation & SAT
Export wooden-case packing, engineer on site for 7–15 days, operator and maintenance training, then site acceptance and a 12-month warranty start.
Certifications and Standards to Specify Before You Sign
Compliance is where low-cost quotations most often fall apart after delivery. Write the following into the purchase specification so that the supplier is contractually obliged to deliver documents, not just hardware.
- CE marking: Declaration of Conformity under the Machinery Directive 2006/42/EC, EMC Directive 2014/30/EU and the Low Voltage Directive, with a technical file prepared for the Machinery Regulation (EU) 2023/1230 that becomes mandatory in January 2027.
- Food contact: SUS304 frames, 316L for acidic, salty or high-moisture products, and gaskets, belts and seals made from materials that meet FDA food-contact substance requirements (21 CFR Part 177).
- Pharmaceutical: cGMP-oriented design with tool-free disassembly, IQ/OQ/PQ documentation packages and 21 CFR Part 11 audit-trail HMI on request.
- Sterile medical consumables: sealing and validation aligned with ISO 11607 for terminally sterilised device packaging.
- North American plants: UL 508A-listed control panel option, NEMA 4X washdown enclosures, 480V/60Hz three-phase power.
- Manufacturing quality: ISO 9001 quality management at the supplier’s own plant and PackML (ISA-TR88) state model for line integration.
Industry benchmarks for OEE, changeover and automation adoption are published in the PMMI 2026 Packaging State of the Industry report, a useful reference when setting acceptance criteria.
Pharma-grade multi-lane liquid filler with 316L contact parts and tool-free changeover.
Factory Pricing: How a Direct-From-Manufacturer Quote Is Structured
Factory pricing for automatic packaging machinery is not a published list; a serious manufacturer quotes each configuration after the product test. A transparent quotation separates the base machine, the dosing system, options such as nitrogen flushing, date coding, zipper or euro-slot punching, the first-year spare parts kit, export packing, freight and on-site installation. If a quote shows one lump sum, ask for the breakdown before comparing it with another supplier.
| Cost driver | What moves the quote | How to control it |
|---|---|---|
| Lanes and output | Each additional lane adds a dosing head, former and sealing width; 12 lanes cost far less than two 6-lane machines. | Size lanes to 3-year volume, not launch volume. |
| Dosing technology | Servo auger with load-cell feedback or multihead weigher versus volumetric cup. | Match accuracy to product value; ±0.1 g matters for probiotics, not for sugar. |
| Materials and hygiene grade | 316L contact parts, washdown IP65 motors, CIP-ready liquid paths. | Specify 316L only where product chemistry requires it. |
| Automation level | Counting, cartoning, case packing and palletising can double a line budget. | Buy a PackML-ready primary machine now and add end-of-line later. |
| Brand components | Siemens or Allen-Bradley PLC, SMC or Festo pneumatics, Schneider drives. | Standardise on what your maintenance team already stocks. |
Factory-direct manufacturer
- Engineers who designed the machine answer technical questions directly.
- No 15–30% channel margin; options priced at cost of components plus labour.
- Custom formers, hoppers and change parts made in-house in days, not weeks.
- Single warranty and one spare parts source for the whole line.
Trading company or distributor
- Technical questions relayed through sales staff, adding days to each answer.
- Margin stacked on machine, options and every later spare part order.
- Custom requests depend on a factory the buyer never audits.
- Warranty claims pass through an intermediary.
Typical commercial terms for export orders
- MOQ: 1 set, standard or custom.
- Payment: 30% T/T deposit with order, 70% against FAT approval before shipment; L/C at sight accepted for turnkey projects.
- Incoterms: EXW Zhongshan, FOB Shenzhen or Guangzhou, CIF or DAP to destination port.
- Lead time: 35–60 days for standard models, 90–150 days for custom turnkey packaging lines.
- Warranty and support: 12 months on the machine, first-year wear-part kit included, remote diagnostics via HMI and lifetime technical support.
Why Global Buyers Source From Ludyway
30+
Years building packaging machinery since 1993
20,000㎡
Modern production facility in Zhongshan, Guangdong
130+
Packaging engineers and technicians
200+
Manufacturing equipment units in-house
Ludyway is one of the largest packaging machine manufacturers in China, specialising in advanced packaging equipment and turnkey production solutions for the food, pharmaceutical and health industries. With over 30 years of industry expertise, the company builds more than 50 intelligent packaging machine models, including multi-lane stick pack, sachet and fully automated packaging systems, for granule, powder, liquid and pouch applications, and serves customers in over 100 countries and regions from a 20,000㎡ facility in Nanlang Town, Zhongshan.
Growth has tracked the shift from single machines to integrated lines: annual revenue passed RMB 100 million in 2010, RMB 300 million in 2020 and RMB 500 million in 2025. Industry coverage of the company’s export growth trend toward RMB 1 billion reflects demand for factory-direct, fully automatic systems that can be commissioned remotely and supported locally.
“A packaging machine is judged on the 10,000th hour, not the first. We build every line to be run, cleaned and changed over by the customer’s own team, with our engineers one call away.”
— Ludyway engineering team, Zhongshan factory
Applications Across Food, Pharma, Personal Care and Agriculture
The same fully automatic multi-lane platform is configured with different dosing modules, film paths and hygiene grades for each sector.
Sports nutrition & supplements
Creatine, protein, collagen and electrolyte powders in 3–30 g stick packs with servo auger dosing, nitrogen flushing and ±0.1 g accuracy for label-claim compliance.
Cosmetics & personal care
Serum, cream, shampoo and sunscreen samples in 1–15 ml 4-side seal sachets, with heated piston pumps for viscous gels and registered printing for brand-critical artwork.
Pet food & treats
Freeze-dried treats, kibble and pet supplements from 5 g sachets to 20 kg bags, using multihead weighers and vacuum or gas-flush options for shelf life.
Agriculture & chemicals
Seeds, fertiliser granules, water-treatment powders and pesticide sachets with dust extraction, anti-corrosion coatings and explosion-proof electrics where required.
Frequently Asked Questions
What is the minimum order quantity for a fully automatic packaging machine?
One set. Multi-lane machines and turnkey lines are built to order, so there is no economic reason to require multiple units. Repeat orders of the same configuration are typically quoted with shorter lead times because tooling and drawings already exist.
How long does delivery take from order to production?
Standard models ship 35–60 days after deposit and approved drawings. Custom turnkey lines with cartoning and palletising require 90–150 days including factory acceptance testing. Add 25–45 days for sea freight to most destinations and 7–15 days for installation and commissioning.
Can one machine package powder, granules and liquid?
Yes. Multi-lane platforms accept interchangeable dosing modules: servo auger for powder, volumetric cup or weigher for granules, and piston or gear pump for liquids and pastes. Changeover between modules and film widths takes 30–60 minutes with tool-free formers.
Do you install and train overseas?
Yes. A Ludyway engineer travels to site for 7–15 days to level, connect and commission the line, run site acceptance on your product and train operators and maintenance staff. Remote diagnostics through the HMI and video support continue through the 12-month warranty and beyond.
How do I obtain factory pricing?
Send the product type, target fill weight or volume, pack dimensions, required output per minute, number of SKUs and destination port. A configured quotation with breakdown, layout sketch and lead time is issued within 3–7 working days, and a free product test on the proposed machine can be arranged before you commit.
Request a Factory-Direct Quote, Sample Test or Catalog
Share your product and output target and receive a configured quotation, 3D layout and lead time within 3–7 working days. Samples can be run on a matching machine at the Zhongshan factory, in person or by live video, before you place an order.
Factory visits welcome: Nanlang Town, Zhongshan, Guangdong, China · Meet the team at international packaging exhibitions throughout the year







